Over the past two weeks we were able to make a lot of progress. We fabricated brand new billet ZF mounts that moves it back an inch and we got the engine and ZF installed in their final position.
The blower and front drive now fit perfectly in the engine bay.
Our next step will be taking the motor back out, prepping the oil, fuel, and water systems, and mate the engine and transmission with the clutch and flywheel installed.
-
3-31-14 UpdatesSee images »
Looks really nice for a package. So how are you going to do the dry sump tank and plumbing?